Excellent transformer core cutting machine manufacturer: Why should the iron core of the transformer be grounded? Transformer core grounding is for safety and electromagnetic compatibility considerations. On the one hand, grounding the transformer core prevents contact voltages caused by ground faults, which can pose a shock hazard to humans. Because when a ground fault occurs on one side of the transformer, the iron core on the other side may have a voltage in contact with the earth. If it is not grounded, this voltage cannot be released. On the other hand, grounding the transformer core can also reduce electromagnetic radiation interference, especially for radio equipment and communication systems. This is because the current will generate a magnetic field in the iron core. If the iron core is not grounded, this magnetic field may leak into the surrounding environment and interfere with the normal operation of other equipment. In conclusion, grounding the transformer core is a protective measure against shock hazards and electromagnetic interference. Discover even more info on core slitting machine.
Why does the current source inverter need a larger transformer capacity? Current source inverter is a common type of inverter. Its control method adopts current loop control, which has the advantages of high precision and strong adaptability, and is widely used in industrial production. Due to the working characteristics of the current source inverter, a large transformer capacity is required for the following reasons: The current source inverter adopts the intermediate inductance: the current source inverter adopts the intermediate inductor, which can realize the phase difference between the output voltage and the current, so as to realize the frequency conversion control. However, since the intermediate inductor needs to withstand large current and voltage, it is necessary to select a transformer with a larger capacity to ensure the normal operation of the inductor.
Power quality plays a crucial role in the performance and longevity of distribution transformer substation. Poor power quality can lead to increased losses, reduced efficiency, and shorter equipment lifespan. Therefore, effective strategies for power quality management are indispensable for the optimal operation of distribution transformers. Harmonic currents, particularly those of higher frequencies, can significantly affect the performance of transformers. These currents are produced by non-linear loads such as computers, variable speed drives, and certain types of lighting systems, causing distortions in the sinusoidal waveform of the electrical supply.
Canwin is a professional ctl line manufacturers & suppliers china, we have been specialized in ctl machines for over 20 years.This cut to length production line adopts advanced control system to ensure the accurate and stable operation of the cut to length production line. Embedded operating terminal can complete parameter setting quickly and conveniently. After the coil material of silicon steel sheet is punched and cut into certain shape and size by this cut to length production line, the classification and finishing work is completed at the end of the production line, and it is automatically stacked into 20 columns and used for the core assembly.
The company mainly produces 150 model oil-type transformercore shearing equipment below 1 600KVA, 300 model dry type transformer core shearing equipment below 6300KVA, 400 model special transformer core shearing equipment below 12500KVA and 600 model special transformer core shearing equipment below 63000KVA. 800 model extra transformer core shearing equipment, 1000 model extra transformer core shearing equipment, the type 1250 model CRGsilicon steel CNC slitting machine, and the dry type transformer core under 110KV automatic cutting and laminated processing center, oil transformer core automatic cutting robot automatic lamination processing center, reactor cutting center below 35Kv, 220KV high voltage transformer tc. CANWIN hire famous designer in Europe as our senior consultant, and germany Siemens as our strategic partner. The products have formed 5 series and more than 50 specifications.
Three-dimensional wound core transformer breaks through the traditional triangle plane structure, adopts three-phase symmetric vertical structure, magnetic circuit completely symmetrical three-phase core products, magnetic resistance is greatly reduced, excitation current, no-load loss, is a kind of using traditional materials, but lower operating noise, structure is more compact and efficient energy-saving oil type transformer. Its excellent performance in energy saving and energy saving and environmental protection is in line with China’s energy conservation policy.
A transformer coil winding machine is an intricate piece of machinery with an essential role in the manufacturing of transformers, combining modern technology and meticulousness to create high-quality products efficiently. The process starts with the feeding of copper wire into the machine, which passes through a line-up of calibrations guides and tensioners designed to secure alignment and prevent damage. An automated system then causes rotation, gradually looping copper wire around the transformer coil. A computerized system oversees variables such as speed, pitch control, layer count and insulation thickness for consistent turns. Moreover, for distinct transformer models or designs, these machines can be fitted with extra features such as automatic lead cutting and tapping mechanisms for increased versatility and productivity.
Want to find good electrical materials, please contact Canwin, a professional electrical material supplier with 20+ years of experiences. Electrical steel, also known as silicon steel sheet, is an important soft magnetic alloy indispensable to power, electronics and military industry, as well as the largest output of metal functional materials, mainly used as the iron core of various motors, generators and transformers. Silicon steel plate’s production process is complex, manufacturing technology is strict, foreign production technology is protected in the form of patent, as the life of the enterprise. Discover additional info on canwindg.com
The metal laser cutting machine focuses the laser emitted from the laser into a laser beam with high power density through the optical path system. The laser beam irradiates the surface of the workpiece to make the workpiece reach the melting point or boiling point. At the same time, the high-pressure gas coaxial with the beam blows away the molten or gasified metal. With the movement of the relative position between the beam and the workpiece, the material will finally form a slit, so as to achieve the purpose of cutting. Laser cutting process uses invisible light beam to replace the traditional mechanical knife. It has the characteristics of high precision, fast cutting, not limited to the limitation of cutting pattern, automatic typesetting, material saving, smooth incision and low processing cost. It will gradually improve or replace the traditional metal cutting process equipment.Want to konw more about metal cutting machine, contact us, one of the most professional metal laser cutting machine manufacturers & suppliers in China.
Energy management system, which uniformly allocates and manages the wind energy, photovoltaic, power grid, battery system and distribution system of micro grid, so as to achieve energy efficiency and high-quality energy allocation. The remote cloud platform and mobile terminal can optimize the system through big data analysis, while reversing the relevant information and operation status to the users’ mobile phone. Containerized Energy Storage System is a complete, self-contained battery solution for a large-scale marine energy storage. The batteries and converters, transformer, controls, cooling and auxiliary equipment are pre-assembled in the self-contained unit. Advantages of containerized power systems: customization, scalability, stackable and cost effective.
Connection group label: According to the phase relationship between the primary and secondary windings of the transformer, the transformer windings are connected into various combinations, which are called the connection group of the windings. In order to distinguish different connection groups, the clock notation is often used, that is, the phasor of the line voltage on the high-voltage side is used as the long hand of the clock, fixed at 12, and the phasor of the line voltage on the low-voltage side is used as the short hand of the clock. The number of the short hand indicates the connection group label. For example, Dyn11 indicates that the primary winding is (triangle) connected, and the secondary winding is (star) connected with a center point, and the group number is (11) points.